Parker Technical Services was appointed by the client to work on the refurbishment of a Leisure Centre in Scotland

History

Parker worked as part of the team to deliver a complete refurbishment of the existing Leisure Centre.

 

Solution

Parker completed the Mechanical and Electrical installation in the new reception and seating area, wet and dry change areas, various studios, offices, kitchen and a new fitness suite.

The works included new LED lighting, Small power, Lighting control, Audio Visual, Data, Fire Alarm, Intruder, Pool Alarm & disabled alarm systems. Specialist LED lighting and scene-setting was also installed.

The facility also required upgrades to the existing heating system consisting of new pumps, radiators, over-door heaters. Upgrades to the existing ventilation system were also carried out. This included the installation of new air handling units, fans and ceiling grilles.

The existing domestic water services were also modified and upgraded via a new water tank, hot water calorifier, pumps, showers and Sanitaryware.

The addition of new air conditioning VRV systems completed the works along with the replacement of the old air conditioning units

“We would like to thank Parker Technical Services for the work they did on the Drumbrae refurbishment. The additional support and services they provided that made the relationship really work. This included being solution focused, flexible but cost conscious. It was a pleasure to work with the team.”

 

Lindsay Renwick: (Edinburgh Leisure Project Manager)

Related Case Studies

M&E installation on iconic university building

  • SECTOR: Education
View
M&E Installation - Edwin James Group

Related Case Studies

Facilities Maintenance for a secondary school

  • SECTOR: Education
  • DURATION: 12 months
View
Facilities Services - Edwin James Group

CONTACT US

To get in touch, please complete the form below: