Parker Technical Services worked as part of the team to deliver the mechanical & electrical installation of the iconic INTO Building at a leading university.

Solution

Parker was tasked with delivering a full Mechanical and Electrical installation throughout the INTO building. The work included:

• Integration of district LTHW into the new buildings distribution systems
• Domestic hot and cold water distribution from plant room to outlets
• AHU’s located throughout the building serving areas with temperature-controlled air.
• Fitting of extractor fans located throughout the building
• Full installation, commission and integration of the university’s site-wide communication system
• A/C installation to the Comms room
• Test and commission the mechanical services
• Full electrical fit-out for all lighting throughout the building
• Full installation of power outlets throughout the building
• Wiring for the state of the art full-screen interactive lecturers board system & integrated projectors for each classroom

Related Case Studies

M&E for £1.4 million Science Centre project

  • SECTOR: Education
  • VALUE: £1.4m
View
M&E - Edwin James Group

Related Case Studies

Local authority mechanical & electrical install

  • SECTOR: Education
  • DURATION: 26-weeks
View
Mechanical & Engineering Install - Edwin James Group

Related Case Studies

Facilities Maintenance for a secondary school

  • SECTOR: Education
  • DURATION: 12 months
View
Facilities Services - Edwin James Group

CONTACT US

To get in touch, please complete the form below: