Local authority mechanical & electrical install

Back To Results
  • Local authority

  • 26-weeks

Parker Technical Services worked to deliver the mechanical & electrical installation on a primary school for the local authority.

History

The new primary school brought together two existing schools and over 300 pupils.

There was a requirement for a full spectrum of mechanical and engineering installs needed before the school could open its gates.

Solution

The project involved the installation of all 14 classrooms which included all electrical works in the open plan learning areas, assembly hall, gym hall as well as the external lighting and time out areas.

Part of the works included a state of the art media installation so that it develops the E-Learning within classrooms and teaching areas.

Works also included the supply, install, test and commission of LV distribution, small power, lighting and controls as well as external and emergency lighting. We also provided the wiring for access control systems, CCTV, intruder and fire alarm and lightning protection.

The installation of a new BMS allows the school to monitor water consumption through smart metering and monitoring.

Related Case Studies

Mechanical & Electrical services for leisure centre

  • SECTOR:
  • VALUE: £ Multi-million pound project
View
Mechanical & Engineering Solutions - Edwin James Group

Related Case Studies

M&E services on a new build Primary school

  • SECTOR: Education
  • DURATION: 12 months
View
M&E Services- Edwin James Group

Related Case Studies

Facilities Maintenance for a secondary school

  • SECTOR: Education
  • DURATION: 12 months
View
Facilities Services - Edwin James Group

CONTACT US

To get in touch, please complete the form below: