Machine maintenance results in £380,000 saving

Back To Results
  • AkzoNobel

Musk Process Services was appointed to develop a new HMI screen to enable fault finding and to reduce downtime hours for a clients existing systems

Download

History

Limitations to the Musk client’s existing systems made it difficult to restart the plant after a wash sequence. This caused 175 hours downtime in the last year. Musk was asked to develop a new HMI screen to assist with fault finding.

Solution

Musk’s on-site engineers developed a new HMI screen to assist with fault finding. This new system provides information on valve positions making fault finding easy.

Results

The HMI screen has dramatically reduced downtime for the client and resulted in a saving of 175 hours and £380,000 per annum across six lines for the client.

The client has given awards to the Musk engineers involved in the upgrade to acknowledge and thank them for their role in the cost and time-saving.

Related Case Studies

Asset care maintenance for global chemical manufacturer

  • SECTOR: Industrial Manufacturing
View
Asset Care Maintenance - Edwin James Group

Related Case Studies

Ensuring compliance to PUWER 98

  • SECTOR: Food & Beverage
View
Compliance to PUWER 98 - Edwin James Group

Related Case Studies

Condition based monitoring saves £30,000

  • SECTOR: Food & Beverage
View
Condition Based Monitoring - Edwin James Group

CONTACT US

To get in touch, please complete the form below: